Water Infrastructure
Pontianak Water Treatment Plant
Project Overview
Design and engineering of a modern water treatment facility serving 200,000+ residents with clean drinking water.
This highly specialized infrastructure endeavor required meticulous planning and state-of-the-art engineering methodologies. By leveraging our deep expertise in water infrastructure, CV. Haded was able to deliver sustainable and resilient results tailored to the unique environmental and logistical challenges of Kalimantan.
Key Achievements
- Completed strictly within the allocated timeframe and budget parameters.
- Implemented rigorous quality assurance protocols that exceeded national standards.
- Minimized ecological disruption through sustainable construction practices.
- Enhanced the long-term infrastructural resilience of the surrounding region.